Poster Hardware closed for good over a weekend in late August, and Patch reported it on August 24 as the owners headed into retirement. Bert Lello had run the store at 2155 Black Rock Turnpike since 1989. Joe Poster opened it the year after the strip was built in 1949. "Thank you to our loyal customers for your support over the years," Lello wrote in a statement.
Two weeks later, on September 8, the Town Plan and Zoning Commission approved a plan to tear down the building Poster had occupied, along with the office building behind it on Stillson Road. Two three-story buildings will replace them, set around a public plaza with outdoor dining. The hardware store's retirement and the redesign of the whole corner arrived in the same season. The corner has been arranged around parking spaces since 1950, and the approved plan arranges it around people on foot.
A Retirement That Came With a Site Plan
The ending was announced months ahead. In January, Patch reported that the business was listed for sale at $320,000, with the inventory included and the owner staying on briefly after a sale closed. Liquidation and retirement signs went up in July, and Patch noted they set off a lot of reminiscing online.
The redevelopment was moving at the same time. In June, CT Insider described Kleban Properties' plans for the site. The 1949 one-story building at 2131 Black Rock Turnpike held Little Pub, Blossoms at Dailey's Flower Shop and Poster Hardware and Houseware. The 1963 building at 414 Stillson Road held Stillson Road Dental Care and the Avery Center for Obstetrics and Gynecology. Kleban Properties has trademarked "Well at Fairfield" as the project's name.
Locals have called the place Dolan's Corner for decades. In a 2011 CT Insider column, the manager of the Angus Steakhouse then on the corner credited Joe "Cozy" Dolan, a Bridgeport bartender, with coming out in 1950 and building the whole strip. He remembered Miro's Farm as the only other thing nearby. That is one person's recollection fifteen years ago, but it matches the timeline Patch gives for Poster's opening.
What the Commission Approved on September 8
The public hearing was held on August 25. One member of the public spoke before the chair closed the hearing at 10:14 p.m. At the next meeting, the commission voted 5-1 to approve the special permit filed by attorney John Fallon on behalf of Stillrock LLC, which the minutes identify as the contract purchasers. Kathy Braun voted no and asked that bird-strike windows be considered. Veronica Monahan abstained.
The approval carries five conditions. The first three cover the side facing the condominiums behind the site, and the last two cover the boundary with Old Navy Plaza next door:
- A wide planting bed runs across the third floor on the side facing the condos, all the way to the stair tower, with no pedestrian access to that five-foot strip.
- The new wall facing the condos gets stone veneer along its entire length.
- Fencing on top of that wall, both during construction and permanently, must be solid and at least six feet high.
- A permanent fence continues along the property line shared with Old Navy Plaza.
- The center's dumpster moves to the existing pad at Old Navy Plaza.
A second vote that night passed unanimously. It amended the Designed Commercial Business District rules so a building can sit up to 25 feet back from the property line, up from 20, when that space becomes a public plaza or pedestrian amenity area. The setback can't be used for driving or parking, and corner plazas may go deeper if they provide enough pedestrian amenities. Under the amended regulation, the extra five feet between building and street can be used only as a plaza or pedestrian amenity space, never as a driveway or parking.
Fewer Driveways, More Plaza
The rest of the plan follows from that rule. Ken Kleban told CT Insider the team would close two curb cuts on Black Rock Turnpike near the traffic light and one on Stillson Road. It would also open a connection to the Old Navy center next door, which Kleban co-owns, so drivers could pass through to Stillson Road without going back onto the Turnpike.
At the March presentation, as Westfair reported, architect Marc Andre described a modest expansion of the Little Pub building to engage the corner, with the parking lot moved to make a more pedestrian-friendly plaza. He used the AT&T store in the neighboring Black Rock Shopping Center as his example: a visitor who parks there could walk into the plaza instead of getting back in the car. An addition behind the Poster's building would give access to the upper floors and a courtyard frontage for new retail.
Vice President Evan Kleban described the goal to CT Insider:
"The goal is to take what's there and just add that second floor, activate the street the way the zoning commission has encouraged everyone. Trying to make Black Rock Turnpike more of a pedestrian street, which we see as fully possible, and little more modern look."
The uses follow the same idea. Ken Kleban said the project centers on wellness, and the proposed center could include saunas, plunge pools, Pilates space, infused showers and counseling services, along with a café. "There will definitely be a rooftop restaurant," he told the commission in March, according to Westfair. He also said the rear building would serve the steady requests for smaller office space that the firm can't currently meet. Fallon called the property "an important gateway location" and "one of Fairfield's most active commercial properties."
The town's traffic question came up early. Economic Development Commission Chairman Steven Rosato praised the proposal in June and said that "the density in the town and traffic continues to mount and mount." He added that the extra parking and curb-cut closures suggested the issue was being considered.
Who Is Still on the Corner
The developers contacted the existing tenants and offered relocation opportunities in the area, CT Insider reported in June. Here is where each business stands as of mid-October, based on the latest public information.
| Business | Address on the corner | Status as of October 2026 |
|---|---|---|
| Poster Hardware and Houseware | 2155 Black Rock Turnpike | Closed in August after the owners retired |
| Little Pub | 2133 Black Rock Turnpike | Operating; its site posted an update October 1, and weekly specials ran October 9 to 15 |
| Blossoms at Dailey's Flower Shop | 2151 Black Rock Turnpike | Its website still lists this address and store hours; no announcement found about a move |
| Avery Center for Obstetrics and Gynecology | Stillson Road | Stillson Road office closed June 30; reopened July 13 at 1925 Black Rock Turnpike, Suite 202A |
| Stillson Road Dental Care | 414 Stillson Road | No new address announced |
| Comprehensive Chiropractic Care | 414 Stillson Road | No new address announced |
The Avery Center is the one tenant with a confirmed new home, and it stayed on the same road. The June CT Insider article gave its destination as 1975 Black Rock Turnpike, but the practice's own listing gives 1925 Black Rock Turnpike, Suite 202A. Patients should use the practice's address. Little Pub's Fairfield location is still serving at 2133. Andre's plan specifically keeps the Little Pub building and expands it toward the corner, though no tenant agreement for the new building has been announced.
Where the Hardware Run Goes Now
A 3,000-square-foot hardware store on the Turnpike was the kind of place you could reach without crossing town. Without it, the nearest independent options are along the Post Road and just over the town lines.
- Hemlock Hardware, 1860 Post Road, Fairfield. A Do it Best member store selling home-improvement and lawn-and-garden supplies. Its own site also features its grill selection, including Weber, Big Green Egg, Traeger and Yeti.
- Westport Hardware, Post Road East, Westport. Sells tools, paint, plumbing and electrical supplies and fireplaces, and takes knife-sharpening drop-offs. Its own website lists both 606 and 616 Post Road East, so confirm the number before you go.
- Barnum Hardware Store, 1788 Barnum Ave., Bridgeport. A local Benjamin Moore retailer with a full paint selection and in-store pickup. It's open weekdays and Saturdays and closed Sundays.
The Dates Nobody Has Announced
The town's posted record ends with the September 8 approval. The commission's October 6 agenda didn't list Dolan's Corner. The posted minutes and agendas give no demolition date, construction start or completion date for this site. A September 15 Citizen Portal summary of an Economic Development Commission meeting mentioned demolition expected in early October after a 60-day hold, but it tied that to "a nearby demolition and redevelopment project" without naming Dolan's Corner as the site. Little Pub, Blossoms, Stillson Road Dental Care and Comprehensive Chiropractic Care haven't publicly said whether they will stay through construction, move or come back to the new buildings. Until a demolition date is posted, the corner looks much as it did in July, minus one storefront: the pub is still open, the florist's website still lists the Turnpike address, and the shop that sold screws and housewares since 1950 is dark.
If you own near Black Rock Turnpike and want to understand how the Dolan's Corner approval, with its closed curb cuts, new plaza and rooftop restaurant, fits into the market around your home, Jillian Klaff and her team can walk you through it. Request a personalized market consultation.